Update – 16:17 on Friday 17 April, 2026
The cleaning of the cooling system is now complete. The effort required to get all the parties involved was a mammoth task which was admirably managed by our AIS (systems teams).
The maintenance was essential to ensure optimal performance and longevity of equipment. Particularly given the imminent arrival of the new high profile National Compute Resource. The entire cooling system was repeatedly drained, cleaned and refilled. All servers were removed, their cooling loops cleaned, and then replaced.
In order to make sure the work was completed to the highest level, numerous water quality tests were carried out to ensure that the system is in the best possible health; this is the first time we have fully cleaned the system since the data centre went into operation in 2017.
Update – 10:30 on Monday 13 April, 2026
We would like to provide you with an update on the maintenance work that has been taking place on BEAR services over the last two weeks (commencing on 30 March 2026). The key message is that BlueBEAR (HPC) will be unavailable until Wednesday 15 April (late afternoon) and the Research Data Store should still be considered at risk.
BlueBEAR (HPC) system
Whilst the cleaning work on the cooling for the BlueBEAR system has been going well, it is currently a day behind schedule as we are waiting for some replacement parts from our suppliers. This will delay the testing of the system and hence when we can make BlueBEAR nodes available for users again. We hope to return BlueBEAR to users by late afternoon on Wednesday 15 April.
Research Data Store (RDS)
Significant work has been carried out on the Research Data Store (RDS), and the system should still be considered at risk whilst we carry out testing.
We will provide further updates on the maintenance on Wednesday morning. We apologise for any inconvenience caused by the ongoing essential maintenance.

We would like to advise BEAR users of upcoming essential maintenance on cooling systems that will impact our services over Easter, in particular the HPC-facility, BlueBEAR, which will be unavailable for two weeks.
Background behind the maintenance

The Park Grange Data Centre is where the University’s High-Performance Computing systems, BlueBEAR and Baskerville reside, as well as the BEAR Research Data Storage (RDS) systems. The data centre relies on water-cooling for most of its operation, and there are several separate water circuits. One circuit provides ambient cooling for the room (Rear Door Heat Exchanger [RDHX]) and is required by all equipment in the room. Another circuit provides direct liquid cooling (DLC) to components internal to servers; this can only be used with specifically engineered servers and is the most efficient way to cool data centre hardware. This is required to support high-end CPU and GPU servers found in both BlueBEAR and Baskerville, and currently for VM’s that run on the BEARCloud service.
At the time it was installed this was one of the very first fully liquid cooled data centres in the UK and was very much a pathfinder system. After running for 7 years, both circuits are due a deep clean as part of a maintenance routine. We have engaged with several companies and have been advised that the only option is to drain, chemically treat, and flush the system. This process will take around two weeks to complete.
What is the impact for users?
We are expecting that BlueBEAR, which is a system cooled predominantly by DLC, will be inaccessible for the entire two-week period of water-cooling maintenance. After this time, we plan to start bringing BlueBEAR back in stages as it is cleaned and ready.
We are currently planning that BEARCloud VM’s, including BEAR hosted websites, will remain available during the maintenance period. See the section below for details on the other DLC service, Baskerville.
However, systems cooled by RDHX (i.e. RDS, Globus for BEAR Data Transfer) should be able to stay online. We hope to do this by distributing these services across two data centres. Although there is a considerable amount of work needed to achieve this, it is a good investment, as it will provide resilience into the future. For the duration of the planned works, we will be installing a temporary air-con system, which will have limited capacity. Therefore, we are only able to maintain certain critical services.
When is the maintenance work likely to happen?
The work has now been scheduled for two weeks commencing 30 March 2026 (over the University Easter holiday), with all services apart from BlueBEAR (and Baskerville) remaining available, but they should be considered at risk.
Baskerville – end of service 30 March 2026
The Baskerville HPC-AI service will come to the end of its agreed 5-year service-life on Monday 30 March, 2026 when the system will be turned off for the last time. All data should be taken off Baskerville before 30 March.